Short Lead Time for 200w Led High Bay Light - RS-LN2310A – Ristar
Short Description:
Quick Details Place of Origin:Guangdong, China Grade:6000 Series TemperT3-T8 Application:Decorations Shape:Flat Alloy Or Not:Is Alloy Model Number:RS-LN2310A Brand Name:RISTAR Color:silver , white, black,Customized Color Length:2M,2.5M,3M,Custom design Anodizing: Corrosion resistant, anti-friction, anti-transport scratch, 11-12μm Free development of aluminum lamps: Developed aluminum lamp ordering quantity 500M-1000M Key words:cabinet aluminum light Packaging & Delivery Selling Units:Sing...
Short Lead Time for 200w Led High Bay Light - RS-LN2310A – Ristar Detail:
Quick Details
Place of Origin:Guangdong, China
Grade:6000 Series
TemperT3-T8
Application:Decorations
Shape:Flat
Alloy Or Not:Is Alloy
Model Number:RS-LN2310A
Brand Name:RISTAR
Color:silver , white, black,Customized Color
Length:2M,2.5M,3M,Custom design
Anodizing:
Corrosion resistant, anti-friction, anti-transport scratch, 11-12μm
Free development of aluminum lamps:
Developed aluminum lamp ordering quantity 500M-1000M
Key words:cabinet aluminum light
Packaging & Delivery
Selling Units:Single item
Single package size: 205X3.2X1.1 cm
Single gross weight:0.412 kg
Package Type:
Customized logo (Min. Order: 1000 Meters)
Customized packaging (Min. Order: 1000 Meters)
Graphic customization (Min. Order: 1000 Meters)
Lead Time :
|
Quantity(Meter) |
1 – 500 |
501 – 1000 |
1001 – 1500 |
>1500 |
|
Est. Time(days) |
3 |
7 |
10 |
To be negotiated |
|
Product details data directory |
||
|
Model: |
RS:2310A |
|
|
Aluminum Body: |
Alu6063-T5 |
|
|
Optional Diffuser: |
PMMA opal / PMMA semi-clear/ PC opal |
|
|
Accessories: |
ABS end caps, Suspension wires, Metal clips |
|
|
Surface Treatment: |
Anodized silver, other colors on request |
|
|
Comptiable LED Strip: |
Eco-Friendly, Water Soluble, Other |
|
|
Max Power: |
<20W/Meter |
|
|
Standard Length: |
2m / 2.5m / 3m/4M/5M/6M |
|
|
Max Custom Length: |
6m with MOQ |
|
|
Installation: |
Pendant / Surface Mounted |
|
|
Application: |
Office, Kitchen, Stores, ect |
|
|
MOQ: |
100 Meters |
|
|
Standard Package: |
Standard Package: |
|
|
Lead Time: |
3~15 working days |
|
|
Warranty: |
3 years |
|
|
Our advantage: |
Manufacturing merchant |
|
|
standard 6063-T5 aluminum profile 11-12μm anodized,anti scratch,corrosion proof |
||
Product detail pictures:









Related Product Guide:
Two North Kansas City schools finally getting stadium lights | 150w Led Outdoor Flood Light
GCC LED Lighting Market Trends, Share, Size, Growth, Opportunity and Forecast 2019-2024 | 150w Led Outdoor Flood Light
The incredibly rich projects administration experiences and a person to 1 service model make the substantial importance of organization communication and our easy understanding of your expectations for Short Lead Time for 200w Led High Bay Light - RS-LN2310A – Ristar, The product will supply to all over the world, such as: Cyprus , Sacramento , Kenya , We follow up the career and aspiration of our elder generation, and we're eager to open up a new prospect in this field, We insist on "Integrity, Profession, Win-win Cooperation", because we have now a strong backup, that are excellent partners with advanced manufacturing lines, abundant technical strength, standard inspection system and good production capacity.
The supplier cooperation attitude is very good, encountered various problems, always willing to cooperate with us, to us as the real God.





